Saturday, July 17, 2010

Progress

Well this is it, kind of a muted yellow, sink is under the window, fridge is to the left of the door opening going out to the garage and the range is 2 ft. from the fridge. There is to be a small island work station in the center of the room.[outlined in front of the window ]

Upstairs bedroom/bath is coming along, next is the built in beds and closets next to the beds [the open areas not drywalled]

Looking down into the dining rm. from the bedroom, the view from. the window. Next trim and install the cabinetsPosted by PicasaAs it turns out I hung 85 sheets of drywall and used 10 buckets of mud. Have to finish the bedroom/bath in the next 45 days, have to be ready for the guests coming in Sept. Wish us Luck.

1 comment:

Miranda @ thehouserhouseblog.com said...

Wow yall! This looks incredible!! I need you guys here to help us :)